Big Creek Powerhouse Penstock






Big Creek Powerhouse 2/2A was severely damaged during the 2020 Creek Fire. SR Diversified was attained to analyze and assess the extent of the devastation. Our team conducted a thorough evaluation and prepared a report detailing the damage and required repairs. From that point SR Diversified, our electrical subcontractor, and the owner partnered to develop a plan for electrical demolition and complete the upgrade/repair design. The project was extensive and encompassed the entire electrical system within the powerhouse.