Big Creek Powerhouse Penstock

Big Creek Powerhouse Penstock
Client
Southern California Edison
Location
Fresno, CA
Start Date
May 1, 2022
Date of Completion
July 31, 2022
Overview

Big Creek Powerhouse 2/2A was severely damaged during the 2020 Creek Fire.  SR Diversified was attained to analyze and assess the extent of the devastation.  Our team conducted a thorough evaluation and prepared a report detailing the damage and required repairs.  From that point SR Diversified, our electrical subcontractor, and the owner partnered to develop a plan for electrical demolition and complete the upgrade/repair design.  The project was extensive and encompassed the entire electrical system within the powerhouse.